Civil CCTV · Handover & Defects Liability · SEQ

Civil Pipeline CCTV Inspections On maintenance, off maintenance, on schedule.

CCTV inspection and condition reporting for civil stormwater and sewer infrastructure across Brisbane, the Sunshine Coast, Moreton Bay, Ipswich, Logan and Gympie.

Every network is coded to WSA 05:2020 in WinCan VX and set out for council and authority handover, so your submission is assessed on the evidence rather than sent back for formatting.

Civil infrastructure CCTV

Inspection and reporting across the civil program.

From proving up a newly laid line to closing out the defects liability period, coded to the standard the receiving authority assesses against.

01 / 06

Newly Installed Pipelines

Prove up the line as laid. Deformation, displaced joints, debris and infiltration picked up while the contractor is still on site and a fix is cheap.

02 / 06

Pre-Handover Reporting

The inspection and report package the receiving authority needs to accept the asset, prepared to their requirements rather than a generic template.

03 / 06

Sewer Networks

New sewer reticulation destined for Unitywater, Urban Utilities, Logan Water or Redland Water, coded to WSA 05:2020 and set out for SEQ Code handover.

04 / 06

Stormwater Networks

Civil stormwater is assessed by the local council rather than a water authority. Reports are coded to WSA 05:2020 and formatted to that council's requirements.

05 / 06

Defects Liability & Off Maintenance

Re-inspection at the end of the maintenance period, in the same format as the original run so the two sets are directly comparable.

06 / 06

Locating & Invert Levels

EM sonde locating with depth and alignment, delivered as a QL-B location report to AS 5488. Invert levels recorded where the asset information spec calls for them.

Request a civil inspection

// Coded in WinCan VX, delivered in 24–48 hours

Who we work with

Built around how civil projects actually run.

Inspection is rarely the critical path until it is. We work to your program, confirm access and scope before mobilising, and turn the report around while the crew is still on site.

Civil Contractors & Subcontractors

Booked around your program, not ours. Scope and access confirmed in writing before the day so the crew is not standing around waiting on an inspector.

Construction Project Managers

One package that goes straight into the handover documentation. Consistent formatting across every stage, so a submission is not held up by paperwork that does not match.

Engineering Consultants

Full WSA 05:2020 coding with observation-level detail, chainages, grades and asset data. Enough to scope a remediation or sign off a design without a second visit.

Developers Handing Over to Council

Reports prepared to the requirements of the authority receiving the asset, whether that is a water service provider under the SEQ Code or a local council for stormwater.

On maintenance, off maintenance

Where CCTV sits in the civil program.

Inspection is required at both ends of the maintenance period. Getting the first one right is what makes the second one straightforward.

During construction

As Laid

Inspection before backfill or immediately after, while the contractor is still mobilised. Deformation, displaced joints and debris are cheap to fix at this point and expensive later.

Optional but recommended
Practical completion

On Maintenance

The handover inspection. A coded report of the network as built, submitted so the authority can accept the asset and start the maintenance period.

Required
Typically 12 months

Defects Liability

The asset sits under your liability. If a defect emerges, the baseline report is what determines whether it was there at handover or appeared afterwards.

Baseline in force
End of period

Off Maintenance

Re-inspection to close out the period and release the asset. Run in the same format as the handover report so the two sets sit side by side.

Required

Both inspections in one place is worth more than the sum of them. When the off maintenance run is coded the same way, by the same operator, against the same baseline, a comparison is a five-minute job rather than an argument. We keep every job on file, so when the period closes out we already have the original.

Talk through your program
What you receive

A handover pack, not just footage.

Every observation is coded and graded in WinCan VX against WSA 05:2020, then packaged for the authority receiving the asset. Formatting stays consistent across every stage of the job, so the off maintenance run drops straight in alongside the original.

Need it in a particular structure for your document control system, or split by stage, lot or catchment? Tell us before the job and it comes out that way the first time.

In your handover pack WSA 05:2020
01 Coded condition reportObservation by observation with defect grading, chainages and condition assessment. Submission ready as a PDF.
02 MP4 video footageThe full run of every line inspected, in high definition, indexed to the report.
03 Still imagesCaptured at every recorded observation, so a defect can be assessed without scrubbing through video.
04 Junctions, materials & gradesLogged through the run, giving the receiving authority the construction and position of the asset.
05 Invert levels & asset locationEM sonde locating with depth and alignment, delivered as a QL-B location report to AS 5488 where it is in scope.
Delivered by secure link or USB within 24–48 hours
Why Pipe View

Why civil crews keep calling us back.

No accreditation badges or slogans. Six things you can hold us to on the job.

01 / 06

Coded to WSA 05:2020

Every observation graded against the Conduit Inspection Reporting Code of Australia, produced in WinCan VX. The format receiving authorities across SEQ already read.

02 / 06

NWP331B-Qualified Operators

The nationally recognised unit for conduit condition evaluation. The person interpreting your pipe is qualified to code what they are looking at.

03 / 06

Reports in 24–48 Hours

Coded and delivered while the crew is still on site, so an inspection is not the thing holding up your next milestone.

04 / 06

Scope Confirmed Before We Roll

Access points, scope and a time window agreed in writing before the day. No arriving to a locked gate, a buried pit or a different job to the one quoted.

05 / 06

Across SEQ Daily

Brisbane to Gympie, including the Sunshine Coast, Moreton Bay, Ipswich, Logan and Redland. Short notice is usually workable, and we will say so straight away if it is not.

06 / 06

Consistent Across Stages

Handover and off maintenance runs coded the same way against the same baseline, so comparing them is a five-minute job instead of an argument.

Request a quote

Get a civil CCTV quote.

Send the site address and what stage you are at. We will confirm scope, access and a booking window that fits your program.

Have drawings, a lot or stage breakdown, or a WAE package underway? Send them through with the enquiry. The more we have upfront, the closer the quote is to the final number and the fewer surprises on the day.

Reports in 24–48 hoursCoded PDF, MP4 footage and stills, ready for handover.
WSA 05:2020 in WinCan VXThe format receiving authorities across SEQ already read.
On and off maintenanceBoth runs in the same format, directly comparable.
Sewer and stormwater150 mm and above, Brisbane to Gympie.
Send your site details
What do we need to CCTV?
Stage
Common questions

Civil CCTV FAQs

Handover, defects liability and reporting across South East Queensland.

01Are your reports accepted by councils and water authorities?

Yes. Every inspection is coded to WSA 05:2020, the Conduit Inspection Reporting Code of Australia published by the Water Services Association of Australia (WSAA), and produced in WinCan VX.

For new sewer reticulation being handed to a water service provider, reports are set out for handover under the South East Queensland Water Supply and Sewerage Design and Construction Code (SEQ Code). Civil stormwater sits outside that code and is assessed by the local council, so those reports are formatted to the receiving council's requirements instead.

02When in the program should we book the inspection?

The handover inspection is the one that has to happen, at practical completion, before the authority will accept the asset and start the maintenance period.

Where the program allows it, an earlier run before or just after backfill is worth doing. Deformation, displaced joints and debris are cheap to correct while the contractor is still mobilised and expensive once the surface is finished over the top.

03What pipe sizes can you inspect?

Our robotic crawlers inspect from 150 mm up through large-diameter trunk sewer and stormwater. Multiple crawler configurations mean the unit is matched to the pipe rather than one machine being pushed to cover everything.

Below 150 mm, send the details through and we will tell you upfront whether it suits our equipment. We would rather say so before you book than turn up and not be able to complete the works.

04How long does an inspection take, and when do we get the report?

It depends on the length of the network, the number of access points and whether the line needs cleaning first. A single stage is often a few hours. A full estate handover across multiple catchments can run several days.

The report is delivered within 24–48 hours of the inspection, by secure link or on USB. Where a job runs over multiple days we can issue by stage rather than holding everything to the end, so your document control is not waiting on the last run.

05What happens if the inspection finds defects before handover?

We record and code what is there, factually, and get it to you fast. What happens next is your call and the authority's, not ours.

Finding a defect at this point is the useful outcome. It is far cheaper to correct while the contractor is still on site and under contract than after the asset has been accepted. Where remediation is carried out, we re-inspect the affected sections and issue an updated report.

06Do you carry out the off maintenance re-inspection as well?

Yes, and it is worth using the same provider for both. When the off maintenance run is coded the same way against the same baseline, comparing the two sets is straightforward. When it is done by someone else in a different format, it turns into an argument about whether a defect is new.

We keep every job on file, so when the period closes out we already have the original run to compare against.

07Can you deliver in our document control format?

Usually, yes. Tell us before the job how you need it structured, whether that is a file naming convention, a split by stage, lot or catchment, or a particular folder layout for your document management system.

Getting that right at the start costs nothing. Reissuing a package after it has already gone into your system costs everyone a week.

08Which areas do you service?

We work daily across the South East Queensland corridor from Brisbane to Gympie, including the Sunshine Coast, Moreton Bay, Ipswich, Logan and Redland.

Projects outside the region are taken on by arrangement. Send the site address and the program dates and we will confirm availability.

Scroll to Top